  • Nature of Work: Hot & Cold insu;lation over Reactor, Blender, Melte, Ethylene Storage Tank Steam line etc.(Project)
  • Year: 1996-97
  • Value of Work: 4,44,728.00
  • Nature of Work: Hot & Cold insulation over Expanded Gas Heater, Boiler, Vessels, Pipe lines.(ARC)
  • Year: 1996-97, 1997-98
  • Value of Work: 16,94,762.00
  • Nature of Work: Cold insulation over Paint circulation line & chilled water line as a sub contractor
  • Year: 1997-98
  • Value of Work: 4,25,000.00
  • Nature of Work: Under Deck insulation job carried out as a sub contractor
  • Year: 1997-98
  • Value of Work: 6,98,400.00
  • Nature of Work: Hot & Cold insulation over Reactors, Vessel and pipe lines
  • Year: 1997-98
  • Value of Work: 4,22,111.00
  • Nature of Work: Cold insulation withPolyurethane Foam(in-situ) over (BBT)storage Tank
  • Year: 1998-99
  • Value of Work: 1,36,000.00
  • Nature of Work: Cold insulation si-situ with Polyurethane Foam over Two Nos of Sphere & Pipe lines
  • Year: 1998-99
  • Value of Work: 4,03,553.00
  • Nature of Work: Supply, Fabrication & Erection of G.I.Duct (as a sub-contractor)
  • Year: 1998-99
  • Value of Work: 11,00,260.00
  • Nature of Work: Polyurethane Foam in-situ work on 2 Nos of Fermentator
  • Year: 1998-99
  • Value of Work: 3,61,900.00
  • Nature of Work: Polyurethane Foam in-situ work on 2 Nos of Fermentator
  • Year: 1999-00
  • Value of Work: 1,28,140.00
  • Nature of Work: False Ceilling job with Gypsum Board
  • Year: 1998-99
  • Value of Work: 3,32,149.00
  • Nature of Work: False Ceilling job with Gypsum Board
  • Year: 1999-00
  • Value of Work: 2,28,945.00
  • Nature of Work: Hot & Cold insulation over pipe lines & Equipment (ARC)
  • Year: 1999-00
  • Value of Work: 20,39,324.00
  • Nature of Work: Supply, Fabrication and Erection of G.I.Duct & Insulation over Duct, for Boiler, Bake oven, Dry oven, Hot water pipe lines and Tank. As a Sub-contractor
  • Year: 2000-01
  • Value of Work: 14,30,000.00
  • Nature of Work: Hot insulation over Hot Deep water Tank and Cladding with Trapezoidal Profile G.I.Sheet
  • Year: 2000-01
  • Value of Work: 15,30,926.00
  • Nature of Work: Cold insulation with Polyurethane Foam at LPG Terminal
  • Year: 2000-01
  • Value of Work: 4,64,602.00
  • Nature of Work: Cold Insulation over pipe lines
  • Year: 2001-02
  • Value of Work: 39,600.00
  • Nature of Work:False Ceilling with Mineral Ceilling panels
  • Year: 2000-01
  • Value of Work: 1,71,200.00
  • Nature of Work: Polyurethane In-Situ work on vessels & pipe lines
  • Year: 1999-00
  • Value of Work: 1,72,000.00
  • Nature of Work: Cold insulation over Two Nos of LNG storage Tank (Area 256000 M2)
  • Year: 2003-04
  • Value of Work: 24,00,000.00
  • Nature of Work: Hot & Cold insulation over pipe lines & Equipment for CNA-II Project
  • Year: 2003-04
  • Value of Work: 15,50,000.00
  • Nature of Work: Cold Insulation over Two Nos of High pressure Separator at SHG Platform of ONGC Offshore
  • Year: 2003-04
  • Value of Work: 7,65,580.00
  • Nature of Work: Insulation of Cold Storage and Deep Freezer (Temp.-4 to -18 deg)
  • Year: 2004-05
  • Value of Work: 8,83,148.00
  • Nature of Work: Polyurethane In-Situ work over 2 Nos Hot and sphere
  • Year: 2004-05
  • Value of Work: 27,13,600-00
  • Nature of Work: Polyurethane In-Situ work over 3 Nos of BBT
  • Year: 2005-06
  • Value of Work: 2,19,000.00
  • Nature of Work: Polyurethane In-Situ work over 3 Nos of BBT
  • Year: 2005-06
  • Value of Work: 1,85,000.00
  • Nature of Work: Polyurethane In-Situ work over 3 Nos of BBT
  • Year: 2005-06
  • Value of Work: 1,32,670.00
  • Nature of Work: Hot insulation over Chimney, Ducting, Hot oil Tank and Hot water pipe lines
  • Year: 2002-03
  • Value of Work: 2,60,000.00
  • Nature of Work: Hot & Cold Insulation over pipe lines at Power Plant
  • Year: 2004-05
  • Value of Work: 3.27,417.00
  • Nature of Work: Hot Insulation over pipe lines at M/s.BPCL, Chembur, 26000 M2 (Labour job only)
  • Year: 2004-05
  • Value of Work: 20,95,360.00
  • Nature of Work: Cold Insulation in-situ with P.U.Over pipe lines & Equipment
  • Year: 2005-06
  • Value of Work: 6,32,926.00
  • Nature of Work: Hot & Cold insulation over pipe lines and Equipment
  • Year: 2006-07
  • Value of Work: 32,84,628.00
  • Nature of Work: Hot & Cold Insulation over pipe lines (ARC)
  • Year: 2004-05
  • Value of Work: 12,00,000.00
  • Nature of Work: Hot & Cold Insulation over pipe lines (ARC)
  • Year: 2005-06
  • Value of Work: 12,00,000.00
  • Nature of Work: Cold Insulation over CAN Tank
  • Year: 2007-08-09
  • Value of Work: 10,83,122.00
  • Nature of Work: Cold Insulation with Polyurethane Foam over 04 Nos of Cold Storage & pipe lines
  • Year: 2008-09
  • Value of Work: 3,26,905.00
  • Nature of Work: Cold Insulation job in-situ over pipe line & Equipment
  • Year: 2007-08
  • Value of Work: 4,18,016.00
  • Nature of Work: Hot & Cold Insulation over pipe lines and Equipment at Ammonia Shut Down
  • Year: 2007-08
  • Value of Work: 21,25,468.00
  • Nature of Work: Polyurethane in-situ over 14 Nos Storage Tank
  • Year: 2007-08
  • Value of Work: 13,80,921.00
  • Nature of Work: Polyurethane in-situ over 6 Nos of Cream Tank
  • Year: 2008-09
  • Value of Work: 31,39,556.00
  • Nature of Work: P.U.Injection over 6 Nos of Chilled Beer Storage Tank
  • Year: 2008-09
  • Value of Work: 7,80,000.00
  • Nature of Work: Hot & Cold insulation over pipe lines & Equipment (ARC)
  • Year: 2008-09
  • Value of Work: 18,00,000.00
  • Nature of Work: PU Injection over 14 Nos of BBT & CCT
  • Year: 2008-09
  • Value of Work: 9,32,000.00
  • Nature of Work: Sealing System for Gas Carrier/Casing pipe annulus within compressor station from Kakinada (AP) to Valsad (Gujarat)
  • Year: 2009-10
  • Value of Work: 17,47,161.00
  • Nature of Work: PU Injection over 14 Nos of BBT & CCT
  • Year: 2009-10
  • Value of Work: 32,07,980.00
  • Nature of Work: PU Injection over 5 Nos of BBT & CCT
  • Year: 2009-10
  • Value of Work: 8,95,032.00
  • Nature of Work: PU Injection over 22 Nos of BBT & CCT (in hand)
  • Year: 2010-11
  • Value of Work: 1,20,000,600.00
  • Nature of Work: PU Injection over 10 Nos of BBT & CCT
  • Year: 2011-12
  • Value of Work: 27,57,377.00
  • Nature of Work: PU Injection over 10 Nos of BBT & CCT
  • Year: 2011-12
  • Value of Work: 78,66,450.00
  • Nature of Work: PU Injection over 03Nos Of UNI Tank
  • Year: 2011-12
  • Value of Work: 12,67,000.00
  • Nature of Work: PU Injection over 7 Nos of Tank (LABOUR JOB ONLY)
  • Year: 2011-12
  • Value of Work: 32,04,071.00
  • Nature of Work: PU Injection over 12 Nos of BBT & CCT
  • Year: 2011-12
  • Value of Work: 27,72,720.00
  • Nature of Work: PU Injection over 07 Nos of Uni Tank
  • Year: 2011-12
  • Value of Work: 92,21,280.00
  • Nature of Work: Hot & Cold insulation over pipe lines & Equipment. (Revamping job)
  • Year: 2012-13
  • Value of Work: 66,73,786.00
  • Nature of Work: PU Injection over 08 Nos of Uni Tank/BBT
  • Year: 2012-13
  • Value of Work: 24,71,997.00
  • Nature of Work: PU Injection over 9 Nos of BBT & fermentator Tank
  • Year: 2012-13
  • Value of Work: 26,49,118.00
  • Nature of Work: PU Injection over 04 Nos of Tank & piping. (LABOUR JOB ONLY)
  • Year: 2012-13
  • Value of Work: 10,79,576.00
  • Nature of Work: PU Injection over 06 Nos of Tank & piping. (LABOUR JOB ONLY)
  • Year: 2012-13
  • Value of Work: 42,88,936.00
  • Nature of Work: PU Injection over 32 Nos of Tank & piping. (LABOUR JOB ONLY)
  • Year: 2013-14
  • Value of Work: 92,28,052 .00
  • Nature of Work: PU Injection over 09 Nos of Tank . (LABOUR JOB ONLY)
  • Year: 2014-15
  • Value of Work: 13,17,000.00
  • Nature of Work: PU Injection over 19 Nos of Tank . (LABOUR JOB ONLY)
  • Year: 2014-15
  • Value of Work: 50,44,379.00
  • Nature of Work: PU Injection over 02 Nos of Tank
  • Year: 2014-15
  • Value of Work: 6,36,400.00
  • Nature of Work: Hot & Cold insulation over pipe lines & Equipment. (Revamping job)
  • Year: 1995 to as on date In hand
  • Value of Work: More than Sixteen Crore
  • Nature of Work: Hot & Cold Insulation over pipe lines and Equipment at Ammonia Shut Down
  • Year: 1997 to 2015
  • Value of Work: 9,41,00,000.00
  • Nature of Work: PU Injection over 03 Nos of CO2 Bulet
  • Year: 2015-16
  • Value of Work: 32,96,751-00
  • Nature of Work: PU Injection over 03 Nos of CO2 Bulet
  • Year: 2015-16
  • Value of Work: 17,35,438.00
  • Nature of Work: PU Injection over 03 Nos of Tank (Fermentator, BBT)
  • Year: 2015-16
  • Value of Work: 14,87,658.00
  • Nature of Work: Hot & Cold insulation over pipe lines And equipments for Dicamba Plant, ME Project
  • Year: 2016-17
  • Value of Work: 1.70,00,000.00
  • Nature of Work: Supply and application of Hot and Cold (PUF in-situ) job for Equipment and pipe lines at CO10 & CT Plant
  • Year: 2017-18 In hand
  • Value of Work: 1,21,43,000.00
  • Nature of Work: Supply and application of Hot and Cold (PUF in-situ) job for Equipment and pipe lines at MEE & SP Plant
  • Year: 2018-19 In hand
  • Value of Work: 15,47,156.00 + 56,48,000.00
  • Nature of Work: PU Injection over 26 Nos of Tank (DAW, BBT,UT, CWT, BufferTank, etc.)
  • Year: 2018-19 In hand
  • Value of Work: 31,83,395.00
  • Nature of Work: PU injection over Reactor and pipe lines, and Dual insulation
  • Year: 2018-19 In hand
  • Value of Work: 21,81,364.00
  • Nature of Work: PU Injection over 05 Nos of Tank ( BBT &UT). (LABOUR JOB ONLY)
  • Year: 2018-19 In hand
  • Value of Work: 11,17,300-00